• Dimmable A60/A19 LED Bulbs
  • Dimmable A60/A19 LED Bulbs
  • Dimmable A60/A19 LED Bulbs
  • Dimmable A60/A19 LED Bulbs
  • Dimmable A60/A19 LED Bulbs
  • Dimmable A60/A19 LED Bulbs

Dimmable A60/A19 LED Bulbs

Color Temperature: Pure White
Lamp Body Material: PC
Power: 9W
LED: Low-power
Lamp Holder/Base: E27
Light: Color Scanning
Samples:
US$ 1/Piece 1 Piece(Min.Order)
| Request Sample
Customization:
Gold Member Since 2022

Suppliers with verified business licenses

Fujian, China
High Repeat Buyers Choice
More than 50% of buyers repeatedly choose the supplier
Customization from Samples
The supplier provides sample based customization services
ODM Services
The supplier provides ODM services
OEM Services
The supplier provides OEM services for popular brands
to see all verified strength labels (11)

Basic Info.

Model NO.
YXS-DP06
Usage
Home
Warranty
2 Years
IP Rating
IP44
Input Voltage
100-240V
Name
LED Bulb
MOQ
500
Package
Gift Box
Transport Package
Gift Box
Specification
A60/A19
Trademark
esun
Origin
China
HS Code
94058090
Production Capacity
100000000

Product Description

Products Details

Model Number: A19 A60 C37 PAR20 BR30 PAR38


Dimmable A60/A19 LED Bulbs

Dimmable A60/A19 LED Bulbs


Application:INDOOR, Indoor Lighting

Color Temperature(CCT):6000K (Daylight Alert)

Lamp Body Material:Aluminum

Base Type:B22, E26, E27

CRI (Ra>):80-90

Input Voltage(V):AC85-265V

Lamp Luminous Efficiency(lm/w):90

Lamp Luminous Flux(lm):100lm/w

Warranty(Year):2-Year

Working Lifetime(Hour):15000

Working Temperature(ºC):
-22 - 45

Color Rendering Index(Ra):
80

Type:
A19

Certification:
CE, EMC, LVD, RoHS, UL

Power Supply:
DC, AC

Light Source:
LED

Switch Mode:
AC

Support Dimmer:
Yes

Lighting solutions service:Lighting and circuitry design, Project Installation

Lifespan (hours):
15000

Working Time (hours):
15000

Product Weight(kg):
0.02


CCT:
3000K-6500K

Keyword:
SMD Led Bulb A19 A60 PAR38

Base:
E27/E26/B22

Beam angle:
220 degree

Material:
Aluminum+PC Cover

Warranty:
2 Years

Power:
5W 7W 9W 10W 12W 15W

LED Light Source:
SMD2835


Dimmable A60/A19 LED Bulbs

FAQ

Q: What is your MOQ?
A: 1PC for sample checking is available. For trial order, 500pcs is our production MOQ.

Q: How about the payment?
A: T/T (30% Deposits before production, 70% balance paid before shipment),
     L/C at sight
     Alibaba payment.


Q: Do you charge for sample?
A: The sample needs to be charged and we will return the sample fee during your quantity order.

Q: Shipping Options?
A: By Express: such as DHL, UPS, TNT, FEDEX etc. Delivery Time takes 3-7 working days.
    Agent specified by client: Pls tell us the contact details of your shipping agent.
    If you do not have agent, we will recommend economical shipping company to transport the goods safely.

Q: How about the delivery time?
A: Sample order: within 3 working days
    Quantity order: 15-20 working days

Q: Can you produce according to clients' design?
A: Sure, we are in lighting business since 2008, OEM and ODM are both welcome. Beside, we have our own mould factory backup, professioanl R&D engineers.

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now